New office construction in Green Bay
Updated November 2026. Every office project we have found in Green Bay's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 5
- Declared value
- $4.8M
- New in 2026
- 2
- Permitted or under way
- 5
- Latest filing
- late 2026
Projects by declared value
- $1 million to $10 million
- 2
- $100,000 to $1 million
- 3
Office projects in Green Bay
- Permittedearly 2026897 S Military AveNew North Shore Bank Ec Approved 5/15/25897 S Military Ave, Green Bay$1 million to $10 million
- Permittedmid 2025200 S Adams StEc Approved 1/22/24 *need Plbg Approval200 S Adams St, Green Bay$1 million to $10 million
- Permittedlate 2026200 S Adams StBank Renovations W/ New Tenant Spaces Ec Approved 7/9/26200 S Adams St, Green Bay$100,000 to $1 million
- Permittedmid 20262280 E MASON St, Suite 400MARSHALLS INTERIOR ALTERATIONS Interior, non-structural updates including painting, flooring, merchandising displays, restroom, lounge, offices, sales floor, and cash wrap. Powering and installing three track lights. Remove and reinstall existing fixtures only. Install one water cooler.2280 E MASON St, Suite 400, Green Bay$100,000 to $1 million
- Permittedearly 2026529 N Monroe AvTurning Showroom Space Into Additional Offices529 N Monroe Av, Green Bay$100,000 to $1 million
Leads in Green Bay, all sectors
None of this place's leads is tied to a office project yet, so these are every sector's.
80 leads from plan commission and zoning meetings in Green Bay so far in 2026, and 81 in all of 2025.
2026 by kind: Conditional use permit 28, Development agreement 21, Variance 13, Subdivision plat 2, Other 16.
| 2025 | 2026 | |
|---|---|---|
| Early January to April | 24 | 40 |
| Mid May to August | 25 | 24 |
| Late September to December | 32 | 16 so far |
- variance to deviate principal structure ground floor front façade standardsVariance · mid 2026 · Ruesch Properties LLC
- requesting approval to deviate from impervious surface standards within a Public Institutional District and side yard setback for a non-residential accessory buildingVariance · mid 2026 · the City of Green Bay Public Works Department
- A 180-day planning option extension to GB Real Estate Investments, LLC for 1531 Main Street.Other · mid 2026 · GB Real Estate Investments, LLC
- Consideration with possible action to approve a term sheet with NeighborWorks Green Bay for the development of Lots 1-6 on Dahlia Lane of the JBS Redevelopment Site.Development agreement · mid 2026
- GLC Minerals LLCConditional use permit · mid 2026
- create a preliminary plat with 9 lots that includes a public dedicationSubdivision plat · mid 2026 · Davel Engineering
- CUP required for single family in OR zoningConditional use permit · mid 2026 · HQ Holdings LLC
- Consideration with possible action to approve a term sheet with Greater Green Bay Habitat for Humanity for the development of Lots 1-7 on Vernon Taylor Drive of the JBS Redevelopment Site.Other · mid 2026 · Greater Green Bay Habitat for Humanity
- Consideration with possible action to approve a term sheet with NeighborWorks Green Bay for the development of Lots 1-6 on Dahlia Lane of the JBS Redevelopment Site.Other · mid 2026
- Development Agreement 26-03 with Velp Locust Investments, LLC for the redevelopment of 1409 Velp Avenue (Tax Parcel 6-45).Development agreement · mid 2026 · Velp Locust Investments, LLC
- Consideration with possible action to vacate a portion of unimproved S Chestnut Avenue right-of-way located at the intersection of Arndt Street, submitted by General Capital Development, Trinity Evangelical Lutheran Church, and the Redevelopment Authority of Green Bay, adjacent property owners (Ald. DeBaker, District 9).Other · mid 2026 · General Capital Development, Trinity Evangelical Lutheran Church, and the Redevelopment Authority of Green Bay
- A request to amend the future land use for a portion of property located at the 600 block of Woodside Road from Low-Density Residential (R1) to Mixed Residential (R3)Other · mid 2026
- The approval of the assignment and assumption of Development Agreement 18-01-A, Whitney School Apartments.Development agreement · mid 2026
- Conditional Use Permit with conditionsConditional use permit · mid 2026 · Safe Haven Hope Center
- Consideration with possible action to approve a one-year development agreement with Greater Green Bay Habitat for Humanity to develop a two-story, single-family home on the site located at 1319 S. Broadway.Conditional use permit · early 2026 · Green Bay Habitat for Humanity
- Consideration with possible action to approve a one-year development agreement with Greater Green Bay Habitat for Humanity to develop a 1.5-story, single-family home on the site located at 1321 S. Broadway.Conditional use permit · early 2026 · Green Bay Habitat for Humanity
- Recieved Revised PLAN*-LKConditional use permit · early 2026
- Consideration with possible action to approve a one-year development agreement with Greater Green Bay Habitat for Humanity to develop a two-story, single-family home on the site located at 1216 S. Broadway.Conditional use permit · early 2026 · Green Bay Habitat for Humanity
- Consideration with possible action to amend the Grandview Planned Unit Development (PUD)Other · early 2026
- Consideration with possible action to approve a one-year development agreement with Greater Green Bay Habitat for Humanity to develop a 1.5-story, single-family home on the site located at 1305 S. Chestnut Avenue along with a HOME funding request of $9,970.00.Conditional use permit · early 2026 · Green Bay Habitat for Humanity
- Green Bay Habitat for HumanityConditional use permit · early 2026
- Development Agreement 25-07 with Grand Boulevard Apartments LLC for the development of 0 Grand Boulevard (Tax Parcel 23-243-1)Development agreement · early 2026 · Community and Economic Development Department
- Consideration with possible action to award a one-year development agreement for the sites located at 1108,1112 & 1116 S Broadway to Radue Homes Inc.Conditional use permit · early 2026
- requesting approval to deviate from minimum standards for an enclosed garage for a 3-4 family residenceVariance · early 2026 · Ruesch Management
- Consideration with possible action to award a 60-day planning option to Radue Homes, Inc. for proposed development on the JBS Redevelopment Site.Development agreement · early 2026 · Radue Homes, Inc.
- General Capital Acquisitions, LLCDevelopment agreement · early 2026
- Development Agreement 26-01 with Three Sixty Real Estate Solutions, LLC for the redevelopment of 227 N. Quincy Street, 221 N. Quincy Street, 624 Pine Street, 618 Pine Street, 616 Pine Street, and 605 Cherry Street, and authorizing the City to approve agreements required by the Developer's lender for financing purposes, subject to final legal review.Development agreement · early 2026 · Three Sixty Real Estate Solutions, LLC
- Consideration with possible action to award a one-year development agreement for the sites located at 1108,1112 & 1116 S Broadway to Radue Homes Inc.Development agreement · early 2026 · Radue Homes Inc.
- Radue Homes, Inc.Development agreement · early 2026
- A request for a Conditional Use Permit to allow for a building to exceed maximum height requirements for property located in a PI Public Institutional zoned district at 511 S Oneida StreetConditional use permit · early 2026
- A request for a Conditional Use Permit to allow for an accessory dwelling unit at an R1 Low-Density Residential zoned parcel at 123 Joan AvenueConditional use permit · early 2026
- requesting approval to exceed commercial/industrial parking lot standardsVariance · early 2026 · Brander Engineering
- create a Planned Unit DevelopmentOther · early 2026
- construction of an office/storage facility to be located at 1209 S Maple Ave.Development agreement · early 2026
- Amendment 3 to Development Agreement 2021-01 with Merge, LLC for the redevelopment of 236 Arndt Street and 101 Bridge Street (Tax Parcels 3-551 and 3-556).Development agreement · early 2026 · Merge, LLC
- Gencap Green Bay Fire Station Apartments, LLCDevelopment agreement · early 2026
- construction of six townhomes on the sites located at 1118 N. Van Buren Street, 1124 N. Van Buren Street, and 910 Reber Street.Development agreement · early 2026
- Radue Homes Inc.Development agreement · early 2026
- 2 OVERHEAD DOORS, EXTERIOR SERVICE DOOR, INTERIOR SERVICE DOOR, INDOOR FENCE & DIVIDING WALL, ADD ELECOther · early 2026 · All Day Properties
- The applicant is seeking to add an accessory building between the coffee shop and the right of way to act as a warming facility for outdoor workers.Other · early 2026 · Milbrew Holdings
- Amendment 1 to Development Agreement 24-05 with On Broadway, Inc for the redevelopment of 211 N. Broadway (Tax Parcel 4-71).Development agreement · early 2026 · On Broadway, Inc
- construction of an office/storage facility to be located at 1209 S Maple Ave.Other · early 2026
- Conditional Use Permit to create a telecommunications tower/wireless communications facility in a residentially zoned districtConditional use permit · early 2026 · Basten Family Real Estate Properties LLC
- Vierbicher Associates, IncSubdivision plat · early 2026
- A request for a Conditional Use Permit at 1087 W Mason Street and 1101 W Mason Street, seeking to create off-street parking exceeding more than two times a developments use minimum required stallsVariance · late 2025
- Consideration with possible action to award a 60-day planning option to Radue Homes, Inc. for proposed development on the JBS Redevelopment Site.Other · late 2025 · Radue Homes, Inc.
- Consideration with possible action to approve $500,000 in TIF funding from the TIF 16 - Military Avenue for the construction of the parking lot and site work associated with the Market on Military.Other · late 2025
- Consideration with possible action to award a planning option for 436 S. Monroe Avenue (Tax Parcel 13-169).Other · late 2025
- AGENDA ITEM # E.2 Consideration with possible action on the request by Department of Public Works to approve the award of contract Parks 8-25 Leicht Memorial Park Pavilion to 8PINE Inc. in the amount of $4,958,656.00 to be funded with Tax Increment District Five (TID) funding.Other · late 2025 · 8PINE Inc.
- award $204,000.00 of TIDAH funding to support Veterans 1st of NEW housing development.Other · late 2025 · Veterans 1st of NEW
24 more from the last four months: Conditional use permit 13, Variance 6, Development agreement 3, Other 2.