Lancaster new construction projects and permits
Updated November 2026. Every project we have found in Lancaster's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 16
- New in 2026
- 16
- Proposed
- 8
- Approved
- 8
- Latest filing
- late 2026
So far in 2026 in Lancaster: 1 construction site filed for stormwater coverage and 1 state building plan filed. 3 open public bids in Grant County.
Projects in Lancaster
- Proposedlate 2026Legally converting the existing single-family home to a rental duplexOther704 S. Harrison Street, Lancaster
- Approvedlate 2026312 North Washington StreetOther312 North Washington Street, Lancaster
- Approvedlate 2026Construction of new pickleball courtsPickleball courts and draft MOU: Lancaster Pickleball Association filed a preliminary site plan for the northeast portion of Schacht Field. Site plan will have a public hearing and be reviewed by Plan Commission on Sept. 14. Staff drafted the outline of an agreement between the city and the association. In essence, city would provide the land; association would build the courts and related facilities, cover all maintenance for 10 years, then turn courts over to the city. Farrey estimates construction will start in spring, and that courts definitely will be usable next year.Lancaster
- Approvedmid 2026Commercial condominiums on Arrow Ridge Lot 7Consider preliminary site plan from ARCC Developments LLC to construct commercial condominiums on Arrow Ridge Lot 7 (Parcel 246-1623-40) and Possible Action: Nothe and Wolf explained the business incubator concept. They would provide shop and storage space for vehicles, trailers, and equipment for construction companies and similar small businesses.588 S. Roosevelt St, Lancaster
- Approvedmid 2026Development of the Schacht Soccer Field landOtherLancaster
- Proposedmid 2026818 S. MadisonSchedule water and sewer connections before proceeding with other work818 S. Madison, Lancaster
- Approvedmid 2026Pigeon Creek Road housingPigeon Creek Road housing. The city engineer, zoning administrator, public works and I have talked with regional planning, SWCAP, and their builder about the infrastructure requirements for the two homes they intend to build this year and the additional homes they intend to build beginning in 2027. We’ve also exchanged a few drafts of a developer agreement. Potential speed bump: The two parcels scheduled for construction this year still do not have separate parcel identification numbers, despite a CSM that the Council approved in 2025. I also visited a site in Boscobel that built a similar model of Skyline home as an infill project. I am participating in interviews of candidates for a WEDC “emerging developer” fellowship; the Pigeon Creek project will be one of the fellowship’s tasks.Lancaster
- Proposedmid 2026Improvements to Old BathhouseImprovements to Old BathhouseLancaster
- Proposedmid 2026New WWTP within existing footprintWastewater Treatment Plant: Staff met with Delta 3 Engineering, Strand Associates, and Wisconsin Nutrient Loss Reduction Clearinghouse to discuss possible cost- reduction options for the next wastewater treatment plant, with a focus on phosphorus reduction. Over the next six months, Clearinghouse will invite landowners in the watershed to participate in a DNR-approved water quality trading agreement. If successful, agreements could eliminate the need for new phosphorus- reduction equipment. There is no up-front cost. If the Clearinghouse is successful, city will owe a one-time fee of $32,000, then negotiate individual agreements with landowners, which typically cost about $90 per credit per year. That total five-year cost of about $475,000 is significantly less than the $6.8 million (plus borrowing costs) that would be required to install tertiary filtration to meet state limits in 2031.Lancaster
- Proposedmid 2026Installing an elevator and ADA-accessible restroom in the history museumOtherLancaster
- Approvedearly 2026507 S. Monroe StreetFinal Site Plan for proposed expansion of Grant Regional Health Center Dan Dreessens from Delta 3 Engineering proposed following solutions to issues raised at preliminary site plan discussion in December: -- Loading dock canopy: Hospital is seeking rezoning of Parcel 246-1046 from C-1 General Business to C-2 Central Business so it can be in compliance with setback requirements.507 S. Monroe Street, Lancaster
- Proposedearly 2026Abandon the Skyview Drive right-of-wayIn addition to the resolutions to abandon the Skyview Drive right-of-way, the City Attorney is drafting other documents necessary to develop the land, including a developer’s agreement, purchase agreement, and utility easements. He is also researching steps necessary to make plat and parcel boundaries align with the actual land being sold.Lancaster
Showing 12 of 16 in Lancaster. Narrow by sector or city above, or see them all in the tracker below.
Sectors
- Municipal2
- Multifamily1
- Worship1
- Retail1
- School1
- Healthcare1
Leads in Lancaster
87 leads from plan commission and zoning meetings in Lancaster so far in 2026.
2026 by kind: Site plan review 24, Rezone 3, Conditional use permit 1, Subdivision plat 1, Other 58.
- Joint Housing Project – SWTC / City of Lancaster / Duncan Construction This Memorandum of Understanding (“MOU”) is entered into by and between Southwest Wisconsin Technical College (SWTC), the City of Lancaster (“City of Lancaster”), and Duncan Construction, collectively referred to as “the Parties.”Other · mid 2026 · Schacht Bros. LLC
- Delta 3 Engineering, Inc.Other · mid 2026
- Pigeon Creek Road housing. The city engineer, zoning administrator, public works and I have talked with regional planning, SWCAP, and their builder about the infrastructure requirements for the two homes they intend to build this year and the additional homes they intend to build beginning in 2027. We’ve also exchanged a few drafts of a developer agreement. Potential speed bump: The two parcels scheduled for construction this year still do not have separate parcel identification numbers, despite a CSM that the Council approved in 2025. I also visited a site in Boscobel that built a similar model of Skyline home as an infill project. I am participating in interviews of candidates for a WEDC “emerging developer” fellowship; the Pigeon Creek project will be one of the fellowship’s tasks.Other · mid 2026
- Consider preliminary site plan from ARCC Developments LLC to construct commercial condominiums on Arrow Ridge Lot 7 (Parcel 246-1623-40) and Possible Action: Nothe and Wolf explained the business incubator concept. They would provide shop and storage space for vehicles, trailers, and equipment for construction companies and similar small businesses.Site plan review · mid 2026 · ARAC Development LLC
- Historical SocietyOther · mid 2026
- Discussion of pickleball courts and draft MOU: Lancaster Pickleball Association filed a preliminary site plan for the northeast portion of Schacht Field. Site plan will have a public hearing and be reviewed by Plan Commission on Sept. 14. Staff drafted the outline of an agreement between the city and the association. In essence, city would provide the land; association would build the courts and related facilities, cover all maintenance for 10 years, then turn courts over to the city. Farrey estimates construction will start in spring, and that courts definitely will be usable next year.Site plan review · mid 2026 · Lancaster Pickleball Association
- Baus Field shedOther · mid 2026
- Portzen ConstructionOther · early 2026
- Portzen Construction of DubuqueOther · early 2026
- Wastewater Treatment Plant: Staff met with Delta 3 Engineering, Strand Associates, and Wisconsin Nutrient Loss Reduction Clearinghouse to discuss possible cost- reduction options for the next wastewater treatment plant, with a focus on phosphorus reduction. Over the next six months, Clearinghouse will invite landowners in the watershed to participate in a DNR-approved water quality trading agreement. If successful, agreements could eliminate the need for new phosphorus- reduction equipment. There is no up-front cost. If the Clearinghouse is successful, city will owe a one-time fee of $32,000, then negotiate individual agreements with landowners, which typically cost about $90 per credit per year. That total five-year cost of about $475,000 is significantly less than the $6.8 million (plus borrowing costs) that would be required to install tertiary filtration to meet state limits in 2031.Other · early 2026
- Final Site Plan for proposed expansion of Grant Regional Health Center Dan Dreessens from Delta 3 Engineering proposed following solutions to issues raised at preliminary site plan discussion in December: -- Loading dock canopy: Hospital is seeking rezoning of Parcel 246-1046 from C-1 General Business to C-2 Central Business so it can be in compliance with setback requirements.Site plan review · early 2026 · Grant Regional Health Center
- Final Site Plan for proposed expansion of Grant Regional Health Center Dan Dreessens from Delta 3 Engineering proposed following solutions to issues raised at preliminary site plan discussion in December: -- Loading dock canopy: Hospital is seeking rezoning of Parcel 246-1046 from C-1 General Business to C-2 Central Business so it can be in compliance with setback requirements.Rezone · early 2026 · Grant Regional Health Center
- In addition to the resolutions to abandon the Skyview Drive right-of-way, the City Attorney is drafting other documents necessary to develop the land, including a developer’s agreement, purchase agreement, and utility easements. He is also researching steps necessary to make plat and parcel boundaries align with the actual land being sold.Subdivision plat · early 2026
- Timmerman reported that he applied for a $50,000 grant from T Mobile toward installation of a new roof and restrooms in the Immanuel Episcopal Church building (aka, the Dewey Church).Other · early 2026
16 more from the last four months: Site plan review 4, Conditional use permit 1, Other 11.