New office construction in Wauwatosa
Updated November 2026. Every office project we have found in Wauwatosa's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 12
- Declared value
- $7.6M
- New in 2026
- 5
- Approved
- 1
- Permitted or under way
- 7
- Latest filing
- mid 2026
Projects by declared value
- $1 million to $10 million
- 3
- $100,000 to $1 million
- 7
- under $100,000
- 1
Office projects in Wauwatosa
- Underwayearly 20268800 Doyne AveFROEDTERT CANCER CENTER RENOVATIONS: 4TH FLOOR, Demo and remodel of existing space on the 4th floor. This includes demo of existing walls and MEPs. New Walls, MEPs, and Finishes.8800 Doyne Ave, Wauwatosa$1 million to $10 million
- Permittedlate 20258701 Watertown Plank RdInterior renovation of shelled space to create laboratory and office space.8701 Watertown Plank Rd, Wauwatosa$1 million to $10 million
- Underwaylate 20251033 Mayfair RdMAYFAIR DIGESTIVE HEALTH CENTER: GI Associates, Selective demolition, new partitions, ceilings, finishes, MEP modifications, roofing penetrations & coordination with building management to deliver a customized office space tailored to tenant specifications1033 Mayfair Rd, Wauwatosa$1 million to $10 million
- Completemid 202610401 INNOVATION Dr Unit: 175AON PLC #175: Interior alterations in an existing office space, suite 175 (Aon), as per plans.10401 INNOVATION Dr Unit: 175, Wauwatosa$100,000 to $1 million
- Completemid 20261200 Mayfair RdSTAFFORD ROSENBAUM RENOVATIONS PHASE-2: Suite 430 for Offices, including new and relocated doors, walls and new finishes1200 Mayfair Rd, Wauwatosa$100,000 to $1 million
- Underwaymid 202610361 INNOVATION Dr Unit: #300PRINCIPAL: #300/325 The project alters approximately 1/3 of 8,900 SF of existing space on the 3rd floor. Existing Open Office space will be converted to a series of enclosed offices with some additional finish updates.10361 INNOVATION Dr Unit: #300, Wauwatosa$100,000 to $1 million
- Permittedearly 202610625 North AvePARAMOUNT REALTY, KONICEK: White-box tenant build out plus adjacent office space. #200, 201 & 22710625 North Ave, Wauwatosa$100,000 to $1 million
- Completeearly 202610701 Research DrNORTHWESTERN MUTUAL: Major interior alteration of a (B) business use occupancy office on the 2nd floor of a multi-tenant floor in an existing 4-story, type IIB, fully sprinklered, multi-tenant office building. There is no exterior work in the scope of this project.10701 Research Dr, Wauwatosa$100,000 to $1 million
- Underwaymid 20252365 Mayfair RdUWCU MAYFAIR ITM RETROFIT: This project involves exterior and minor interior modifications to the existing UW Credit Union branch located at 2365 N Mayfair Road. The scope includes reconfiguring the drive-up area by reducing the number of lanes from four to three, replacing the existing ATM with new ITM equipment, resurfacing the drive-up lanes, modifying the existing islands, and removing the drive-up window with infill at the opening. Existing light fixtures under the canopy will be replaced with no structural changes to the canopy. Interior work is limited to the installation of a new countertop, where the drive-up window was previously located. The majority of the work is exterior.2365 Mayfair Rd, Wauwatosa$100,000 to $1 million
- Completemid 202510001 Innovation DrJT ENGINEERING :Interior alteration of an existing tenant space on the first floor. This was previously occupied by an Business office. The new tenant is an Engineering firm.10001 Innovation Dr, Wauwatosa$100,000 to $1 million
- Underwaymid 2026Happy Ending No Kill Cat ShelterConditional use permit10506 W. Blue Mound Road, Wauwatosaunder $100,000
- Approvedearly 2025Chase Bank25-0003 11135 Burleigh - Chase Bank - New Construction, Change of Materials11135 Burleigh, Wauwatosa
Recent plan commission items
2 in all: Conditional use permit 1, New construction 1.
Office leads in Wauwatosa
1 office leads from plan commission and zoning meetings in Wauwatosa so far in 2026, and 1 in all of 2025.
2026 by kind: Conditional use permit 1.
| 2025 | 2026 | |
|---|---|---|
| Early January to April | 1 | 1 |
| Mid May to August | 0 | 0 |
| Late September to December | 0 | 0 so far |
- 25-0003 11135 Burleigh - Chase Bank - New Construction, Change of MaterialsNew construction · early 2025 · Chase Bank