New office construction in Neenah
Updated November 2026. Every office project we have found in Neenah's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 3
- Declared value
- $1.3M
- New in 2026
- 2
- Permitted or under way
- 2
- Latest filing
- late 2026
Projects by declared value
- $1 million to $10 million
- 1
- $100,000 to $1 million
- 2
Office projects in Neenah
- Completelate 2026219 W Cecil StInterior and exterior remodel of existing credit union219 W Cecil St, Neenah$1 million to $10 million
- Underwaymid 202655 Jewelers Park Dr. NeenahSmall office remodel on in existing office space on third floor. Suite #30055 Jewelers Park Dr. Neenah$100,000 to $1 million
- Underwaymid 2026111 E Wisconsin AveAdd new office, new ceiling grid and lights in existing Chase Bank111 E Wisconsin Ave, Neenah$100,000 to $1 million
Leads in Neenah, all sectors
None of this place's leads is tied to a office project yet, so these are every sector's.
9 leads from plan commission and zoning meetings in Neenah so far in 2026, and 19 in all of 2025.
2026 by kind: Site plan review 5, Rezone 1, Other 3.
| 2025 | 2026 | |
|---|---|---|
| Early January to April | 1 | 4 |
| Mid May to August | 14 | 3 |
| Late September to December | 4 | 2 so far |
- Addition and renovation to the Bergstrom GM - Neenah location.Site plan review · mid 2026 · Bergstrom Automotive
- Early start footing and foundation work for future addition.Site plan review · mid 2026 · Packaging Corporation of America
- Above ground construction of the Mix Cooler Addition. Footings/foundation work on separate permit.Other · early 2026 · Galloway Company
- 220,000 SF addition to the existing RGL building 62 at 1750 Dixie Road, Neenah. The addition will be for additional storage of palletized rolls of expanded/ exposed plastic on pallets for pile storage. The structure will be steel girders, bar joists, precast wall panels, and a metal roof deck.Site plan review · early 2026 · RGL Logistics
- Deputy Director Schmidt went over the request to rezone the property which currently has some parcels zoned R1, Single-Family and other parcels are currently zoned C1, Commercial District.Rezone · early 2026 · Eminent Development Corporation
- 1st-gen fit-out of North-half of medical office building for new accredited surgery center, including 405 sf addition to accommodate upgraded electrical/mechanical/sprinklersOther · early 2026 · Surgery Center of the Fox Valley
- The request is to construct a 64,000 square foot industrial laundry facility.Site plan review · late 2025
- CH District Master Plan Amendment #1-25 and Project Plan Approval #1-25- CH District – Multi- Family Housing – 215 E. Forest Avenue (Ord. No. 2025-14)Other · late 2025
- The new business, 7Brew Coffee, would be in the excess parking lot of 828 Fox Point Plaza.Other · mid 2025
- The new business, 7Brew Coffee, would be in the excess parking lot of 828 Fox Point Plaza.Conditional use permit · mid 2025
- Deputy Director Schmidt went over the CSM regarding splitting the north end of the Shattuck lot into two lots.Conditional use permit · mid 2025 · New Springs Christian Academy
- 100 X 50 Storage building. Erosion control and early start permits obtained separately.Site plan review · mid 2025
- Fire Station 31 RenovationSite plan review · mid 2025
- Above ground construction of the Mix Cooler Addition. Footings/foundation work on separate permit.Site plan review · mid 2025 · Galloway Co
- Deputy Director Schmidt went over the final plat for the Courtside Fields subdivision.Subdivision plat · mid 2025
- Four classroom addition to existing school totaling 4,754 square feet. Footing and foundation work on early start permit.Conditional use permit · mid 2025
- The proposal is to take one lot that is currently on Meadow Ave and Byrd Ave and subdivide it into two separate parcels with the intent of creating a zero-lot line duplex.Other · mid 2025
- Deputy Director Schmidt went over the proposal received by the Neenah Police Department to construct a 2,800 square foot shed on the southwest portion of their property.Site plan review · mid 2025
- Preliminary Plat #1-25 – Courtside Fields – 600 Elm StreetSubdivision plat · mid 2025
- Deputy Director Schmidt went over the CSM regarding splitting the north end of the Shattuck lot into two lots.Certified survey map · mid 2025
- Deputy Director Schmidt went over the final plat to the 2nd Addition to Freedom Acres.Subdivision plat · mid 2025
- Applicant is requesting a variance for a substandard shore yard setback for a driveway.Variance · early 2025
3 more from the last four months: Site plan review 2, Other 1.