New multifamily construction in Marshfield
Updated November 2026. Every multifamily project we have found in Marshfield's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 7
- Declared value
- $3.0M
- New in 2026
- 7
- Permitted or under way
- 7
- Latest filing
- mid 2026
Projects by declared value
- $100,000 to $1 million
- 7
Multifamily projects in Marshfield
- Underwaymid 20262113/2115 Shortess DriveNew Construction Duplex2113/2115 Shortess Drive, Marshfield$100,000 to $1 million
- Underwaymid 20262228/2230 Shortess DriveNew Construction Duplex2228/2230 Shortess Drive, Marshfield$100,000 to $1 million
- Underwaymid 20262222/2224 Shortess DrNew Construction Duplex2222/2224 Shortess Dr, Marshfield$100,000 to $1 million
- Underwaymid 20262201/2203 Shortess DriveNew Construction Duplex2201/2203 Shortess Drive, Marshfield$100,000 to $1 million
- Underwaymid 20262205/2207 Shortess DrNew 1 & 2 Family Home2205/2207 Shortess Dr, Marshfield$100,000 to $1 million
- Underwaymid 20262221/2223 Shortess DrNew Construction Duplex2221/2223 Shortess Dr, Marshfield$100,000 to $1 million
- Underwaymid 20262227/2229 Shortess DrNew Construction Duplex2227/2229 Shortess Dr, Marshfield$100,000 to $1 million
Leads in Marshfield, all sectors
None of this place's leads is tied to a multifamily project yet, so these are every sector's.
9 leads from plan commission and zoning meetings in Marshfield so far in 2026, and 10 in all of 2025.
2026 by kind: Conditional use permit 4, Rezone 1, Site plan review 1, Subdivision plat 1, Other 2.
| 2025 | 2026 | |
|---|---|---|
| Early January to April | 5 | 3 |
| Mid May to August | 1 | 6 |
| Late September to December | 4 | 0 so far |
- rezone the property from "CMU" Community Mixed Use to "PD" Planned Development, in conjunction with a property line adjustmentSite plan review · mid 2026 · the Boson Company
- exception to Section 18-35(7) of the zoning code to address the minimum pavement setbacks from the property lineConditional use permit · mid 2026 · BKV Group
- rezone the property from "CMU" Community Mixed Use to "PD" Planned Development, in conjunction with a property line adjustmentRezone · mid 2026 · the Boson Company
- review and approve a proposed amendment to the High School/Madison Elementary Campus Master Plan to allow for a new parking area and move the sand volleyball courtsOther · mid 2026
- requesting to have a Personal Storage Facility and also an exception to the required residential bufferyard (minimum opacity 0.80)Conditional use permit · early 2026
- Preliminary Subdivision Plat reviewSubdivision plat · early 2026
- requesting to have an outdoor eating area and also an exception to the 40 foot stacking requirementConditional use permit · early 2026
- Panda Express, Inc.Conditional use permit · late 2025
- New 69,049 sf (footprint), 78,873 sf truck assembly facility for large truck builds, complete with 2 large truck paint booths, 7-bay body shop, warehouse and 12 station assembly area. office areas on 2 levels, support the truck assembly operation and includes offices, break rooms, locker rooms, training rooms, sales, etc.Conditional use permit · late 2025 · Interstate Marshfield, LLC
- Construction of new 99,000 sqft manufacturing building, PEMB on concrete foundation walls, concrete slab, metal sheeted insulated walls, membrane roofConditional use permit · late 2025
- This conditional use permit allows the construction of a fourth accessory structure to be used as a personal greenhouse.Conditional use permit · mid 2025
- to allow for the construction of a non-residential accessory building prior to the construction of a principal structure for the property located at 311 East Heritage Drive (parcel 33-07387).Conditional use permit · early 2025 · (North Ridge Church)
- New 69,049 sf (footprint), 78,873 sf truck assembly facility for large truck builds, complete with 2 large truck paint booths, 7-bay body shop, warehouse and 12 station assembly area. office areas on 2 levels, support the truck assembly operation and includes offices, break rooms, locker rooms, training rooms, sales, etc.Other · early 2025 · I-State
- Campus Master Plan Update Request by Marshfield Fairgrounds Park to approve the five-year Campus Master Plan update for the Marshfield Fairground Park Campus Master Plan.Other · early 2025
1 more from the last four months: Other 1.