New office construction in Marshfield
Updated November 2026. Every office project we have found in Marshfield's plan commission minutes, building permits and state filings, new buildings and the biggest jobs first.
- Projects
- 6
- Declared value
- $5.0M
- Permitted or under way
- 2
- Latest filing
- late 2026
Projects by declared value
- $1 million to $10 million
- 2
- $100,000 to $1 million
- 4
Office projects in Marshfield
- Completelate 20252213 E 5th StNew wood framed office building on grade beam concrete slab. Manufactured trussed, insulated walls and attic, drywall finishes2213 E 5th St, Marshfield$100,000 to $1 million
- Completelate 20261417 W Mcmillan StBuilding addition to existing facility with interior remodel of reception and office spaces1417 W Mcmillan St, Marshfield$1 million to $10 million
- Completelate 2025101 W 4th StMajority of Work Confined to Ground Floor, With Limited Scope on Second Floor, Including Vertical Opening, of Existing Office Building.101 W 4th St, Marshfield$1 million to $10 million
- Underwaymid 20263219 S Central AveTear out and replace current offices. New windows, flooring, insulation, ceiling, walls, and trimmings.3219 S Central Ave, Marshfield$100,000 to $1 million
- Completemid 20261001 N CENTRAL Ave Suite 201Expanding 3 offices, changing the layout of another office and adding in 6 additional offices. Adjusting HVAC and electrical as needed.1001 N CENTRAL Ave Suite 201, Marshfield$100,000 to $1 million
- Underwaymid 20261932 E 26th StAddition of approx 1824 sqft of wood frame 1 hour rated office space adjacent to existing office space, sprinkled1932 E 26th St, Marshfield$100,000 to $1 million
Leads in Marshfield, all sectors
None of this place's leads is tied to a office project yet, so these are every sector's.
9 leads from plan commission and zoning meetings in Marshfield so far in 2026, and 10 in all of 2025.
2026 by kind: Conditional use permit 4, Rezone 1, Site plan review 1, Subdivision plat 1, Other 2.
| 2025 | 2026 | |
|---|---|---|
| Early January to April | 5 | 3 |
| Mid May to August | 1 | 6 |
| Late September to December | 4 | 0 so far |
- rezone the property from "CMU" Community Mixed Use to "PD" Planned Development, in conjunction with a property line adjustmentSite plan review · mid 2026 · the Boson Company
- exception to Section 18-35(7) of the zoning code to address the minimum pavement setbacks from the property lineConditional use permit · mid 2026 · BKV Group
- rezone the property from "CMU" Community Mixed Use to "PD" Planned Development, in conjunction with a property line adjustmentRezone · mid 2026 · the Boson Company
- review and approve a proposed amendment to the High School/Madison Elementary Campus Master Plan to allow for a new parking area and move the sand volleyball courtsOther · mid 2026
- requesting to have a Personal Storage Facility and also an exception to the required residential bufferyard (minimum opacity 0.80)Conditional use permit · early 2026
- Preliminary Subdivision Plat reviewSubdivision plat · early 2026
- requesting to have an outdoor eating area and also an exception to the 40 foot stacking requirementConditional use permit · early 2026
- Panda Express, Inc.Conditional use permit · late 2025
- New 69,049 sf (footprint), 78,873 sf truck assembly facility for large truck builds, complete with 2 large truck paint booths, 7-bay body shop, warehouse and 12 station assembly area. office areas on 2 levels, support the truck assembly operation and includes offices, break rooms, locker rooms, training rooms, sales, etc.Conditional use permit · late 2025 · Interstate Marshfield, LLC
- Construction of new 99,000 sqft manufacturing building, PEMB on concrete foundation walls, concrete slab, metal sheeted insulated walls, membrane roofConditional use permit · late 2025
- This conditional use permit allows the construction of a fourth accessory structure to be used as a personal greenhouse.Conditional use permit · mid 2025
- to allow for the construction of a non-residential accessory building prior to the construction of a principal structure for the property located at 311 East Heritage Drive (parcel 33-07387).Conditional use permit · early 2025 · (North Ridge Church)
- New 69,049 sf (footprint), 78,873 sf truck assembly facility for large truck builds, complete with 2 large truck paint booths, 7-bay body shop, warehouse and 12 station assembly area. office areas on 2 levels, support the truck assembly operation and includes offices, break rooms, locker rooms, training rooms, sales, etc.Other · early 2025 · I-State
- Campus Master Plan Update Request by Marshfield Fairgrounds Park to approve the five-year Campus Master Plan update for the Marshfield Fairground Park Campus Master Plan.Other · early 2025
1 more from the last four months: Other 1.